Drawing Scale & Paper Fit

Largest standard scale that fits your plan on A0 to A4

Design data
m
m
mm
mm
Settings & basis
ResultPreliminary · verify before design
Largest scale that fits1:100On A1 landscape
Within limitPlan fills 76 % of the usable area
Usable drawing area631 × 564 mm
Exact scale needed1:76.1
Plotted size at 1:100480 × 300 mm
Smallest sheet for 1:100A1

Paper sizes per ISO 216 (A series), landscape. Allow space for the legend, notes and key plan if they sit inside the drawing area, and follow the scales in your project CAD standard.

What to verify before design ↓

Verify before using in design

  • Leave room for legend, notes, north arrow and key plan.
  • Use the scales listed in the project CAD standard or the client's requirements.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Nov 2026✓ Tested against worked examples✓ Reviewed by a senior engineer · Nov 2026

Formula

Scale needed = max(width ÷ usable width, height ÷ usable height), then the next standard scale

Standards and references

  • ISO 216:2007 (paper sizes, A series)
  • ISO 5455:1979 (technical drawings: scales)
  • Your project CAD / BIM standard

Assumptions

  • Landscape sheet; the title block is a strip on the right; the plan is a rectangle of the given real size.

Inputs and units

Drawing extent, width (real size)m0.1–10000
Drawing extent, height (real size)m0.1–10000
Paper size—
Margins each sidemm5–25
Title block width (right side)mm0–200

Typical range: last column

Worked example (default values)

  • Drawing extent, width (real size)48 m
  • Drawing extent, height (real size)30 m
  • Paper sizeA1 (841 × 594 mm)
  • Margins each side15 mm
  • Title block width (right side)180 mm
Largest scale that fits1:100Plan fills 76 % of the usable area

Next steps

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.