Text & Dimension Height in Model Space

Plotted text height × scale, and the matching dimension scale

Design data
Settings & basis
ResultPreliminary · verify before design
Text height in model space250 mm2.5 mm on paper at 1:100
Dimension scale (DIMSCALE)100
Annotation scale1:100
2.5 mm text250 mm
3.5 mm text350 mm
5 mm text500 mm

Text heights follow the ISO 3098 series (1.8, 2.5, 3.5, 5, 7, 10 mm). With annotative text, set the paper height and the annotation scale instead and let the software scale it. Use the heights in your project CAD standard where it sets them.

What to verify before design ↓

Verify before using in design

  • Plot a test sheet and check the smallest text is readable at the final paper size.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Nov 2026✓ Tested against worked examples✓ Reviewed by a senior engineer · Nov 2026

Formula

Model height = paper height × scale (÷ 1000 when the model is in metres)

Standards and references

  • ISO 3098 (technical product documentation: lettering)
  • ISO 129-1 (dimensioning)
  • Your project CAD / BIM standard

Assumptions

  • Plain (non-annotative) text drawn in model space at the stated scale.

Inputs and units

Drawing scale 1:1–10000
Text height on paper—
Model units—

Typical range: last column

Worked example (default values)

  • Drawing scale 1:100
  • Text height on paper2.5 mm (notes, dimensions)
  • Model unitsMillimetres
Text height in model space250 mm

Next steps

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.