Drafting & BIM

CAD Layers, Line Weights and Plot Styles

A drawing that follows a layer and plotting standard prints the same every time, can be used as a background by other trades and can be checked quickly.

Layer names

  • Use the project CAD standard. Layer names are built from fixed fields such as discipline, element and status. The AIA / US National CAD Standard style is common, for example E-POWR-SOCK-N for new sockets; BS EN ISO 13567 defines a similar idea with fixed-length fields.
  • Keep text, dimensions, hatching and title block on their own layers, so they can be switched off or reused.
  • Never draw on layer 0 (except inside blocks) or on Defpoints: Defpoints does not plot.
  • Set colour, line type and line weight 'ByLayer' so the layer controls the look.

Line weights and plotting

  • Use a small set of weights from the ISO 128 series, for example 0.18, 0.25, 0.35, 0.5 and 0.7 mm: thin for backgrounds and hatching, thick for the main work of your trade.
  • Show other trades' backgrounds greyed (screened) so your own work stands out.
  • Colour-based plot styles (CTB) map pen colours to weights; named styles (STB) give the weight by name. Use whichever the project standard sets, and send it with the files.
  • Purge and audit before issue, and bind or include xrefs so the receiver sees what you saw.
Good to knowMake a template file (DWT) with the project layers, text styles, dimension styles and title block, and start every drawing from it.

Use with this guide

Free

CAD Layer Standard

Project layer list with colour, line type, line weight and plot setting; flags duplicates and bad names

  • How to use
  • Layer standard
  • Layer standard (SAMPLE)

Excel (.xlsx) · version 1.0 · revised 13 Nov 2026 · blank template with a filled sample · check it against your project specification

CalculatorText & Dimension Height in Model SpaceChecklistDrawing Check Before Issue (CAD)
Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.