Site safety

Heat Stress & Summer Working Rules in the Gulf

Gulf summers are among the hottest working conditions in the world. Heat illness can progress from cramps to heat stroke within hours, and every Gulf country restricts outdoor work in the hottest part of the day. A heat stress plan is as much part of the programme as the concrete pours.

The rules

  • Each GCC country bans outdoor work in direct sun during set midday hours in summer (see the table). The ministries announce the dates each year.
  • Qatar also stops all work at a location when the WBGT exceeds 32.1 °C, at any time of day, and requires heat stress risk assessments and annual health checks (Ministerial Decision 17 of 2021).
  • In Egypt we found no fixed national midday ban like the GCC ones; projects set their own heat stress plans. Check the latest rules and the client's requirements on every project.

Measuring heat

  • Air temperature alone underestimates the risk. WBGT combines humidity (wet-bulb), radiant heat (globe) and air temperature.
  • Measure with a WBGT meter at the work area, at least hourly in summer, and record it (see the WBGT calculator).
  • Humid coastal sites can be more dangerous than hotter dry ones.

Controls

  • Plan heavy work for early morning; respect the midday ban; use work-rest cycles that tighten as WBGT rises.
  • Cool drinking water close to the work, shaded or air-conditioned rest areas, and cooling for confined or enclosed spaces.
  • Acclimatise new and returning workers over about a week; use a buddy system and train everyone in the signs of heat illness.
  • Heat stroke is an emergency: stop work, cool the person immediately and call for medical help.

Midday outdoor work bans as announced for 2026 (check each year)

CountryPeriodNo outdoor work in the sun
Qatar1 Jun – 15 Sep10:00 – 15:30 (and all work stops above WBGT 32.1 °C)
Saudi Arabia15 Jun – 15 Sep12:00 – 15:00
UAE15 Jun – 15 Sep12:30 – 15:00
Kuwait1 Jun – 31 Aug11:00 – 16:00
Oman1 Jun – 31 Aug12:30 – 15:30
BahrainAbout mid-Jun – end Aug / mid-Sep12:00 – 16:00
Good to knowPut the WBGT reading on the daily report. On the day an inspector asks, a log of hourly readings is the best evidence that the site was managed.

Use with this guide

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.