WBGT Heat Stress Check

Wet-bulb globe temperature against the stop-work limit

Design data
°C
°C
°C
°C
Settings & basis
ResultPreliminary · verify before design
WBGT31.6 °COutdoor formula: 0.7 wet-bulb + 0.2 globe + 0.1 air
ReviewBelow the 32.1 °C limit by 0.5 °C: keep measuring and apply water, shade and work-rest cycles
Margin to the limit0.5 °C
Share from wet-bulb (humidity)18.2 °C
Share from globe (radiant heat)9.6 °C

ISO 7243 formula. Measure with a WBGT meter at the actual work location (natural wet-bulb and black-globe readings, not a weather-app temperature). In Qatar all work must stop when WBGT exceeds 32.1 °C, at any time of day (Ministerial Decision 17 of 2021). Other countries and clients set their own limits and work-rest tables by work rate. Seasonal midday bans apply whatever the WBGT.

What to verify before design ↓

Verify before using in design

  • Check the current rules for the country (midday ban dates and hours) each summer.
  • Use the project heat stress plan for work-rest cycles, water and acclimatisation.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples

Formula

Outdoors with sun: WBGT = 0.7 Tnwb + 0.2 Tg + 0.1 Ta Indoors / no sun: WBGT = 0.7 Tnwb + 0.3 Tg

Standards and references

  • ISO 7243:2017 (heat stress assessment using the WBGT index)
  • Qatar Ministerial Decision 17 of 2021 (heat stress protection)
  • ACGIH TLVs for heat stress (work-rest by work rate)
  • Client or company heat stress plan

Assumptions

  • Readings from a WBGT meter at the work location.
  • Limit set by the authority or the project; work-rest tables are not included.

Inputs and units

Natural wet-bulb temperature°C10–40
Black-globe temperature°C15–75
Air (dry-bulb) temperature°C10–55
Location—
Stop-work WBGT limit (Qatar: 32.1)°C25–35

Typical range: last column

Worked example (default values)

  • Natural wet-bulb temperature26 °C
  • Black-globe temperature48 °C
  • Air (dry-bulb) temperature38 °C
  • LocationOutdoors in sunshine
  • Stop-work WBGT limit (Qatar: 32.1)32.1 °C
WBGT31.6 °CBelow the 32.1 °C limit by 0.5 °C: keep measuring and apply water, shade and work-rest cycles

Next steps

More Site safety calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.