Sustainability

Green Building Ratings in Qatar, Saudi Arabia & Egypt

Green building ratings turn sustainability into a list of measured credits: energy, water, materials, indoor environment and site practices. Each country in the region has its own system, and international ones are common too.

The regional systems

  • Qatar: GSAS (Global Sustainability Assessment System) by GORD, rated on a six-star scale. Ashghal requires it for new government buildings, and some developers make a GSAS rating part of their permit process.
  • Saudi Arabia: Mostadam, from the Sustainable Building Program of the Ministry of Municipalities and Housing, covering energy, water, health and quality of life; Diamond is its highest level.
  • Egypt: Green Pyramid Rating System (GPRS) by the Egyptian Green Building Council, a voluntary system; in Egypt LEED is the most used certification, followed by EDGE.
  • LEED (USGBC) and EDGE (IFC) are used across the region, often chosen by international owners and lenders.

What it means on site

  • Construction-stage credits need evidence: waste segregation and recycling records, recycled-content and regional-material certificates, low-emitting material data sheets.
  • Site practices: dust, noise and erosion control, water use, and indoor air quality during construction (duct protection, flush-out).
  • Commissioning and metering credits depend on the MEP testing records and the BMS.

Managing the credits

  • Assign each credit to an owner and a deadline, and collect evidence as the work happens.
  • Check material submittals against the credit requirements before approval, not after delivery.
  • Changes to materials or systems can lose credits: check the rating impact of every substitution.
Good to knowAsk for the credit tracker in the first month. Most lost credits are lost because evidence was never collected, not because the work was wrong.

Use with this guide

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.