Good Scheduling Practice in Primavera P6 and MS Project
The software calculates dates from logic. Most programme problems come from settings and habits, not from the tool.
Settings to agree
- Scheduling option for out-of-sequence progress (retained logic is the usual choice).
- Calendars per activity type; one project default calendar.
- Duration type and % complete type set the same way for all similar activities.
- Critical path defined by longest path or total float, and stated in the narrative.
Habits
- Link activities with logic; never type dates to make the bars look right.
- Use milestones for key events and interfaces.
- Keep activity names unique and readable: verb + object + location.
- Save a copy before each update and compare.