Facility management

FM KPIs and SLAs

KPIs show whether the maintenance contract is working; SLAs set the response and fix times the client pays for. Keep both few, clear and measured from the CMMS.

Common KPIs

  • PPM compliance: planned work done on time ÷ planned work scheduled.
  • Reactive response and fix time: share of calls attended and fixed within the SLA times.
  • Availability of critical systems: chillers, generators, lifts, UPS.
  • Backlog: open work orders older than the agreed time.
  • Statutory compliance: should be 100 %.
  • Energy use intensity and customer satisfaction where the contract covers them.

Writing SLAs

  • Define priorities with examples, for example P1 emergency (safety risk, total loss of a critical system), P2 urgent, P3 routine.
  • Set both a response time (arrive and make safe) and a fix time (permanent repair).
  • Agree how time is counted: from the call or from the ticket, working hours or 24/7.
  • Link payment deductions only to KPIs you can measure without argument.
Good to knowAudit a sample of closed work orders on site every month. A KPI built on tickets that were closed without the work being done is worse than no KPI.

Use with this guide

CalculatorPPM ComplianceCalculatorMaintenance Manpower Estimate
Free

PPM Schedule & Compliance Tracker

PPM tasks by asset with next due date, overdue flags and monthly on-time compliance

  • How to use
  • PPM schedule
  • PPM schedule (SAMPLE)
  • Monthly compliance
  • Monthly compliance (SAMPLE)

Excel (.xlsx) · version 1.0 · revised 12 Nov 2026 · blank template with a filled sample · check it against your project specification

CalculatorBuilding Energy Use Intensity (EUI)
Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.