Environmental

Environmental Management on Site

Construction sites affect their neighbours and the environment every day: dust, noise, water, waste, fuel and traffic. A construction environmental management plan (CEMP) turns permit conditions and good practice into daily site routines.

The CEMP

  • Lists the environmental aspects of the work (dust, noise, discharges, waste, fuel, ecology) and their impacts, with controls, responsibilities and monitoring.
  • Includes the permit conditions, emergency procedures (spills, fires) and complaint handling.
  • Many clients require an ISO 14001-based environmental management system from the main contractor.

Daily practice

  • Weekly environmental inspections with findings, actions and photos (see the checklist).
  • Monitoring where required: dust (PM10), noise at sensitive receivers, water quality of discharges.
  • Toolbox talks on spills, waste segregation, dust and water use.
  • Record incidents and complaints; investigate and close them like safety incidents.

Records

  • Keep permits, monitoring results, waste tickets, inspection reports and training records together.
  • Authorities and rating systems (GSAS, Mostadam, LEED) ask for the same evidence: collect it once, as you go.
  • Report monthly: incidents, complaints, monitoring exceedances, waste diversion and fuel and water use.
Good to knowFind out who your neighbours are before work starts. A school, hospital or housing next door changes your working hours, noise limits and dust controls.

Use with this guide

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.