Construction Noise at a Receiver

Combine sources, attenuate with distance and compare with the limit

Design data
dB(A)
dB(A)
dB(A)
dB(A)
m
m
dB(A)
ResultPreliminary · verify before design
Level at the receiver70.6 dB(A)84.6 dB(A) combined at 10 m, minus 14.0 dB for distance
Over limitExceeds the limit by 5.6 dB: move or quieten equipment, add a barrier, or limit working hours
Combined level of all sources84.6 dB(A)
Distance needed to meet the limit96 m
Sources counted3

Point sources in free field: each doubling of distance takes off about 6 dB. Ground absorption, barriers, buildings and wind change real levels (ISO 9613-2 gives the full method). Two equal sources add 3 dB, not double. Use measured or manufacturer levels for your equipment and the limits in your environmental permit.

What to verify before design ↓

Verify before using in design

  • Measure at the receiver with a calibrated sound level meter.
  • Check the limits and hours in the environmental permit.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026✓ Tested against worked examples

Formula

L total = 10 log₁₀ Σ 10^(Li/10) L receiver = L ref − 20 log₁₀(r2 ÷ r1)

Standards and references

  • ISO 9613-2 (attenuation of sound outdoors)
  • BS 5228-1 (noise control on construction sites)
  • Environmental permit noise conditions

Assumptions

  • Point sources in free field, 6 dB per doubling of distance.
  • No barriers, ground absorption or reflections.

Inputs and units

Source 1 level at the reference distancedB(A)40–130
Source 2 (0 = none)dB(A)
Source 3 (0 = none)dB(A)
Source 4 (0 = none)dB(A)
Reference distance of the levelsm1–100
Distance to the receiverm1–5000
Noise limit at the receiver (permit or project)dB(A)35–90

Typical range: last column

Worked example (default values)

  • Source 1 level at the reference distance80 dB(A)
  • Source 2 (0 = none)82 dB(A)
  • Source 3 (0 = none)75 dB(A)
  • Source 4 (0 = none)0 dB(A)
  • Reference distance of the levels10 m
  • Distance to the receiver50 m
  • Noise limit at the receiver (permit or project)65 dB(A)
Level at the receiver70.6 dB(A)Exceeds the limit by 5.6 dB: move or quieten equipment, add a barrier, or limit working hours

Next steps

More Environmental calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.