Dust, Air Quality & Noise Control

Dust and noise cause most complaints from neighbours, and in the Gulf dry ground and strong winds make dust a daily issue. Both are easier to prevent at source than to fix after a complaint.

Dust

  • Main sources: earthworks, haul roads, stockpiles, cutting and grinding, and wind over bare ground.
  • Controls: water spraying or dust suppressants on roads, speed limits, covered trucks, wheel washes, covered or wetted stockpiles, cutting with water or extraction.
  • Stop dusty work in strong winds (a wind speed trigger in the CEMP helps).
  • Monitor PM10 at the boundary where the permit requires it; compare with the permit limits.

Noise

  • Levels add logarithmically: two equal sources add 3 dB; doubling the distance from a source takes off about 6 dB (see the calculator).
  • Choose quieter equipment, keep it maintained, turn engines off when idle, and place generators and compressors away from receivers.
  • Use barriers or site hoarding close to the source or the receiver; agree working hours, especially for night work.
  • Measure at the receiver with a calibrated meter and log the results.

Other air emissions

  • Generators and plant: maintain engines, avoid oversized lightly loaded generators, connect to the grid early.
  • No burning of waste on site.
  • Control fumes from welding, paints and solvents in enclosed areas (also a health issue).
Good to knowKeep a water bowser on site from day one. The first dust complaint usually comes in the first week of earthworks.