Earthing Systems: TN, TT, IT

The earthing system describes how the source and the exposed metal parts of an installation connect to earth. It decides how earth faults are cleared.

The letters

  • First letter: source. T = directly earthed, I = isolated or earthed through an impedance.
  • Second letter: exposed parts. T = connected to a local earth electrode, N = connected to the source neutral point.
  • After a dash: S = separate neutral and protective conductors, C = combined (PEN).

Where you meet each one

  • TN-S: separate PE all the way from the transformer. Common for buildings with their own substation.
  • TN-C-S: combined PEN from the utility, split into N and PE at the intake.
  • TT: consumer has its own earth electrode. Earth fault loop is high, so RCDs are essential.
  • IT: source not earthed. A first fault does not trip, so supply continues. Used in hospitals' operating theatres and some industrial processes, with insulation monitoring.
Good to knowCheck the earthing system before choosing protective devices: disconnection times and the need for RCDs depend on it.