Construction Waste & Hazardous Materials
Construction produces large amounts of waste, most of which can be reused or recycled if it is kept separate. Hazardous materials need stricter control: one spill or illegal dump can cost more than the whole waste budget.
Waste management
- A site waste management plan sets waste streams, targets and responsibilities.
- Segregate at source: concrete and masonry, metals, timber, cardboard and plastics, general waste.
- Use licensed carriers and approved disposal or recycling facilities; keep every ticket.
- Rating systems (GSAS, Mostadam, LEED) score the share diverted from landfill (see the calculator).
Hazardous materials
- Hazardous waste (oils, solvents, paint residues, chemical containers, contaminated soil) is stored separately, labelled and removed by licensed contractors with transfer records.
- Keep safety data sheets for every chemical on site.
- Report contaminated soil or unknown buried materials immediately and stop work in that area.
Fuel, chemicals and spills
- Store fuel and chemicals in bunded areas or double-skinned tanks; a common rule is a bund holding at least 110 % of the largest container (check local rules).
- Refuel on drip trays away from drains and excavations.
- Keep spill kits at fuel and chemical stores and on plant; train people to use them; report every spill.