Pipe Friction Loss

Head loss by Hazen-Williams

Design data
L/s
mm
m
Settings & basis
ResultPreliminary · verify before design
Friction head loss3.53 m34.6 kPa over 60 m
Per 100 m5.89 m
Velocity1.81 m/s
Add for fittings (≈ 20–30 %)4.41 m

Valid for water at normal temperatures. Use equivalent lengths for valves and fittings in final design.

What to verify before design ↓

Verify before using in design

  • Add fittings as equivalent lengths and check the pump duty.
  • Check the edition of each standard that your project specification calls for.
  • Confirm with manufacturer data and the approved design before construction.
Basis & methodVersion 1.0 · Nov 2026Basis last checked: Oct 2026

Formula

hf = 10.67 · L · Q^1.852 ÷ (C^1.852 · d^4.87)

Standards and references

  • Hazen–Williams equation

Assumptions

  • Water at about 4–25 °C in turbulent flow.

Inputs and units

FlowL/s
Internal diametermm
Pipe lengthm
Pipe material—

Typical range: last column

Worked example (default values)

  • Flow4 L/s
  • Internal diameter53 mm
  • Pipe length60 m
  • Pipe materialuPVC / PE · C 150
Friction head loss3.53 m

Next steps

More Plumbing calculators

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.