Traffic Management & Road Safety in Works
Road works put workers next to live traffic. A temporary traffic management (TTM) plan, approved by the authority and set out exactly on site, is what keeps both drivers and workers safe.
Plan and permits
- Prepare TTM drawings to the authority's work zone guide (in Qatar, Ashghal's work zone traffic management guidance; other countries have their own manuals).
- Get road-closure and diversion approvals and police coordination before work starts.
- Plan each stage: sign positions, taper lengths, buffer zones, lane widths and pedestrian routes.
On site
- Advance warning signs, tapers with cones or barriers, a buffer zone and the work area, in that order.
- Use rigid barriers (concrete or water-filled, as approved) where workers are close to fast traffic.
- Night work: lighting towers aimed away from drivers, high-visibility clothing and lit or reflective signs.
- Daily TTM inspection and a record of changes; remove or cover signs that no longer apply.
Permanent safety
- Road markings, studs and signs to the national traffic manual.
- Safety barriers and crash cushions at hazards, with correct working width and end treatments.
- Road safety audits at design, before opening and after opening find problems before they cause crashes.