Scaffolding

Scaffolds are temporary structures that carry people and materials at height. They must be designed or follow a recognised standard configuration, erected by trained scaffolders, and inspected before use.

Design and erection

  • Standard configurations follow recognised guidance (e.g. NASC TG20 for tube and fitting, or the system maker's manual); anything else needs a design.
  • Sound base: base plates on sole boards on firm, level ground; never on loose blocks or bricks.
  • Ties to the structure at the specified spacing; extra ties where sheeting or netting adds wind load.
  • Full boarded platforms with guardrails, intermediate rails and toe boards; safe access by ladder or stair tower.

Inspection and tags

  • Inspected by a competent person after erection, at regular intervals (often every 7 days) and after storms, alterations or damage.
  • A tag system at each access point shows if the scaffold is safe to use (often green) or not (red).
  • Only trained scaffolders alter a scaffold; users must not remove ties, boards or rails.
  • Record each inspection in the scaffold register.

Common faults

  • Missing ties or ties removed by other trades.
  • Overloaded platforms, especially with blocks or tiles.
  • Gaps between platform and building face; missing toe boards.
  • Mobile towers used without outriggers or with wheels unlocked.
Good to knowWalk round the scaffold with the tag in your hand. If the date is old or the tag is red, nobody climbs.