Working at Height
Work at height means any place where a person could fall and be injured. Plan it before anyone climbs.
Order of control
- Avoid: do the work from the ground where possible (pre-assemble, long-reach tools).
- Prevent falls: guardrails, toe boards, scaffolds, mobile elevating work platforms.
- Minimise the consequence: harness with lanyard to a rated anchor, safety nets, airbags.
Checks every shift
- Scaffold tag shows it was inspected and is safe to use (green) before you step on.
- Inspect harness webbing, stitching and hooks before each use. Remove any harness that has arrested a fall.
- Keep three points of contact on ladders and use them only for short, light work.
- Cover or guard every floor opening and mark it clearly.