Facility management

Maintenance Strategies: Planned, Reactive and Predictive

Not every asset needs the same care. A good maintenance plan mixes strategies according to how critical the asset is and how it fails.

The main strategies

  • Reactive (run to failure): fix it when it breaks. Fine for cheap, non-critical items with no safety impact, such as a single light fitting.
  • Planned preventive (PPM): tasks at fixed intervals or run hours, such as filter changes, greasing and generator load runs.
  • Condition-based / predictive: act when measurements show a change: vibration on pumps and fans, thermography on panels, oil analysis on generators and transformers.
  • Statutory: tasks the law or the authority requires at fixed intervals (fire alarm, fire pumps, lifts, pressure vessels, water hygiene). They are not optional.

How to choose

  • Rank assets by criticality: safety, business impact, cost and time to repair.
  • Critical assets with measurable wear (chillers, large pumps, generators, switchgear): add condition monitoring to PPM.
  • Start PPM intervals from the maker's manual and the O&M manual, then adjust with your own failure records.
  • Track the share of reactive work: if it stays high, the PPM plan is missing something.
Good to knowWrite each PPM task as a clear instruction with readings to record. 'Check AHU' teaches nothing; 'Record fan current and filter pressure drop' builds a history you can use.

Use with this guide

CalculatorEquipment Availability (MTBF / MTTR)
Free

PPM Schedule & Compliance Tracker

PPM tasks by asset with next due date, overdue flags and monthly on-time compliance

  • How to use
  • PPM schedule
  • PPM schedule (SAMPLE)
  • Monthly compliance
  • Monthly compliance (SAMPLE)

Excel (.xlsx) · version 1.0 · revised 12 Nov 2026 · blank template with a filled sample · check it against your project specification

ChecklistGenerator Weekly & Monthly Run
Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.