Fire System Testing, Approvals & Maintenance
Fire systems need approval twice: on paper before installation, and in person before the building can be occupied. After that they must be kept working for the life of the building.
Approvals
- Fire drawings, calculations and material data go to the civil defence for approval before installation; only approved and listed products may be used.
- Coordinate fire alarm, sprinklers, smoke control and gas systems through one cause and effect matrix.
- Keep the approval stamps and conditions with the drawings on site.
Witness testing
- Pre-test everything yourself: flushing, pressure tests, flow tests, alarm and interface checks.
- Civil defence witnesses the final tests: pumps, sprinkler flow switches, hydrants and hose reels, smoke control, fire alarm interfaces.
- The completion or occupancy certificate depends on passing these tests and closing their comments.
Maintenance
- NFPA 25 (or the local equivalent) sets inspection, testing and maintenance intervals for water-based systems.
- Only licensed companies may maintain fire systems in many Gulf countries; keep their contract and logbook current.
- Impairments (systems out of service) need a written procedure, fire watch and notification.