Codes & Specifications in Use
Each country has its own codes and specifications on top of international standards. Contracts name the editions that apply, and authorities review submissions against their own code, so knowing the local document saves rejected submittals.
Qatar
- The Qatar Construction Specifications (QCS) are the national specification for building and infrastructure works; the current edition, QCS 2024, is published on the Qatar standards portal.
- QCS sections cover everything from earthworks and concrete to mechanical, electrical and drainage works, and refer to BS, EN, ISO and ASTM standards.
- Authority rules sit beside QCS: KAHRAMAA regulations for power and water connections, Civil Defence requirements for fire and life safety, and Ashghal standards for roads and drainage.
Saudi Arabia
- The Saudi Building Code (SBC) is mandatory. It is issued by the National Committee for the Saudi Building Code and updated every five years.
- The 2024 edition became mandatory on 30 June 2025, after a transition period in which the 2018 edition still applied; it added three new structural codes (seismic design of steel, repair of existing concrete, and GFRP-reinforced concrete).
- Parts are numbered by discipline, for example SBC 201 (general building), SBC 401 (electrical), SBC 501 (mechanical), SBC 601 (energy), SBC 701 (plumbing) and SBC 801 (fire protection).
Egypt
- Works follow the Unified Building Law No. 119 of 2008, its Executive Regulations, and the codes issued by the Ministry of Housing, Utilities and Urban Communities.
- The Egyptian codes of practice (for example for loads, reinforced concrete and fire protection) are prepared through the Housing and Building National Research Center (HBRC).
- Many projects, especially international ones, also specify BS, EN or US standards: the contract decides which governs when they differ.
Sources
Checked on 31 Oct 2026 · next review 30 Apr 2027
- Qatar Construction Specifications 2024 (Qatar standards portal)
- SIMA: Saudi Building Code 2024 update
- Mondaq: legal considerations of construction in Egypt
Laws and procedures change. This is a summary for orientation, not legal advice; always confirm with the authority and the contract.