Building Permits & Authority Approvals

A building permit is only the first approval. Utilities, civil defence, environment and roads authorities each approve their part, and a completion or occupancy certificate closes the process. The permit route belongs in the programme from day one.

Qatar

  • Building permits are issued by the Ministry of Municipality through its electronic building permit system, submitted by a registered engineering consultancy.
  • In October 2025 the ministry launched an AI-assisted permit system that checks drawings against the regulations and the plot data, linked with GIS, Ashghal and KAHRAMAA data; it cites permits in about two hours instead of up to 30 days for eligible cases.
  • Separately plan for KAHRAMAA (power and water), Civil Defence (fire and life safety), Ashghal (roads, drainage connections) and Ministry of Environment and Climate Change permits for site activities.

Saudi Arabia

  • Building permits are issued electronically through the Balady platform. A design engineering office prepares and submits the drawings; a technical inspection company checks them against the Saudi Building Code.
  • Documents include the title deed, a cadastral report, contracts with the design office, supervising office and contractor, a soil report, and latent defects insurance; the permit is not valid until the insurance is paid.
  • Once issued, permit details are shared with Civil Defence and other entities through linked services; check what each needs for your building type.

Egypt

  • Permits are issued by the local administrative unit (city or district) under the Unified Building Law, supervised by the ministries of Local Development and Housing; new cities have their own authority.
  • Typical documents: proof of ownership, site plan and drawings stamped by a syndicate-registered engineer, a soil report for larger buildings, and the zoning certificate.
  • A permit is generally valid for one year for starting work; digital permits and one-stop centres are being rolled out in some cities.
Good to knowMake a permit register on the first day: each approval, the authority, who submits it, documents, expected review time and expiry. Most delays come from the approval nobody owned.

Sources

Checked on 31 Oct 2026 · next review 30 Apr 2027

Laws and procedures change. This is a summary for orientation, not legal advice; always confirm with the authority and the contract.