Testing and Commissioning Stages
Equipment passes through a series of tests before handover. Each stage proves something the previous one could not.
The sequence
- FAT: factory acceptance test, witnessed at the manufacturer before shipping.
- Pre-commissioning: installation checks, insulation resistance, continuity, torque checks.
- SAT / commissioning: each system energised and tested on site against its design.
- Load bank testing: generators and UPS tested at full rated load with artificial loads.
- IST: integrated systems test, where all systems work together under simulated events such as utility failure.