Tacoma Narrows Bridge, 1940
A slender suspension bridge in Washington State twisted itself apart four months after opening, in a moderate wind.
What happened
- The very shallow, flexible deck was efficient on paper but aerodynamically unstable.
- Wind caused growing torsional oscillation (aeroelastic flutter) until the deck failed.
- No people died. The collapse was filmed and became a classic engineering lesson.
The lesson
- Dynamic behaviour matters, not only static strength.
- Wind tunnel testing became standard for long-span bridges and tall buildings.