Ronan Point, 1968
A gas explosion in an 18th-floor flat of a London tower block blew out a load-bearing wall panel. The whole corner of the building collapsed. Four people died.
What happened
- The precast panel system had poor connections and no alternative load path.
- Losing one panel caused the floors above to fall, and their impact brought down the floors below.
The lesson
- Structures must resist disproportionate (progressive) collapse.
- Modern codes require ties, alternative load paths or key element design for this reason.