Rana Plaza, 2013
An eight-storey commercial building near Dhaka, Bangladesh collapsed, killing more than 1,100 people, mostly garment workers.
What happened
- Upper floors had been added without proper approval, and the building was used for heavy industry it was not designed for.
- Heavy generators and machinery added load and vibration.
- Large cracks appeared the day before. Workers were still ordered back inside.
The lesson
- Change of use and added floors need structural assessment and approval.
- Visible cracking is a stop-work signal until an engineer has assessed it.