Site practice

Petty Cash Control on Site

Petty cash pays for small, urgent items: pantry supplies, small tools, transport, courier, urgent spares. It is easy to lose control of, so keep it small and simple.

Rules to set

  • A fixed float (imprest) refilled by the amount spent, with receipts.
  • A limit per single payment; anything larger goes through a purchase order.
  • One custodian; a locked box; no personal loans or salary advances.

Each expense

  • Date, description, category, cost code, amount, receipt number, who received it and who approved it.
  • Original receipt attached; a signed voucher when no receipt is possible (for example a taxi).

Each month

  • Count the cash with a witness; cash + receipts must equal the float.
  • Prepare the refill request by category; book the costs to their codes.
Good to knowRefill petty cash every month even if the float is not empty; small monthly checks find mistakes while they are small.

Use with this guide

Free

Petty Cash Book

Float, each expense with receipt and category, running balance, refill request summary by category and a monthly count check

  • How to use
  • Cash book
  • Cash book (SAMPLE)

Excel (.xlsx) · version 1.0 · revised 21 Nov 2026 · blank template with a filled sample · check it against your project specification

ChecklistPetty Cash Monthly Check
Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.