Site safety

Lifting Operations

Every lift needs a plan proportionate to its risk, prepared by a competent person and briefed to the whole team.

Plan the lift

  • Know the load weight, centre of gravity and lifting points.
  • Check the crane's load chart at the planned radius, including rigging weight.
  • Check ground bearing capacity under outriggers and use mats.
  • Set wind speed limits from the crane manufacturer's manual.

On the day

  • Use only certified, inspected slings, shackles and hooks with visible tags.
  • Set up an exclusion zone. Nobody stands or walks under a suspended load.
  • One appointed signaller communicates with the operator.
  • Use tag lines to control the load.
Good to knowTandem lifts and lifts above 75 % of crane capacity are usually classed as critical and need an approved detailed lift plan.