Project management

How to Read a Project Specification

The specification says what quality is required and how it is proven. Most sections follow the same three-part pattern, so once you know where to look, each section reads quickly.

The usual structure

  • General conditions and general requirements (submittals, quality, testing, temporary facilities) apply to every trade.
  • Each technical section: Part 1 General (scope, references, submittals, quality, warranty), Part 2 Products (materials, approved makes, ratings), Part 3 Execution (installation, tests, inspection).
  • Local frameworks (for example QCS in Qatar) are often called up by section; read the project specification for what it adds or changes.

Pull these out of every section

  • Submittals: shop drawings, data sheets, samples, mock-ups, calculations.
  • Tests: factory, site and commissioning tests, who witnesses them, and hold points.
  • Approved manufacturers and the rule for equals.
  • Warranties, spare parts, training and O&M manual requirements.
  • Put them in the Specification Requirements Register with dates.

Common traps

  • A requirement in Part 1 or in the general requirements that nobody priced (extra tests, extended warranty).
  • An old standard edition referenced: ask which edition applies.
  • Words like 'or equal' still need the engineer's approval.
Good to knowRead Part 1 of each section on day one and copy every submittal and test into a register. Late submittals start in unread Part 1s.

Use with this guide

Free

Specification Requirements Register

Every submittal, test, sample, mock-up, warranty and O&M requirement by specification section, with due and done dates and overdue flags

  • How to use
  • Register
  • Register (SAMPLE)

Excel (.xlsx) · version 1.0 · revised 21 Nov 2026 · blank template with a filled sample · check it against your project specification

Free

Specification Compliance Statement

Clause by clause: specified requirement, offered, complies / deviation / not applicable, reference in the data sheet, with a summary of deviations for the submittal

  • How to use
  • Compliance
  • Compliance (SAMPLE)

Excel (.xlsx) · version 1.0 · revised 21 Nov 2026 · blank template with a filled sample · check it against your project specification

ChecklistSubmittal Compliance with Specification and BOQ
Free

Submittal & RFI Tracker

Two registers with status codes, due dates, days open and overdue flags

  • How to use
  • Submittal register
  • RFI register

Excel (.xlsx) · version 1.1 · revised 7 Nov 2026 · blank template · check it against your project specification

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.