How to Read a Project Specification
The specification says what quality is required and how it is proven. Most sections follow the same three-part pattern, so once you know where to look, each section reads quickly.
The usual structure
- General conditions and general requirements (submittals, quality, testing, temporary facilities) apply to every trade.
- Each technical section: Part 1 General (scope, references, submittals, quality, warranty), Part 2 Products (materials, approved makes, ratings), Part 3 Execution (installation, tests, inspection).
- Local frameworks (for example QCS in Qatar) are often called up by section; read the project specification for what it adds or changes.
Pull these out of every section
- Submittals: shop drawings, data sheets, samples, mock-ups, calculations.
- Tests: factory, site and commissioning tests, who witnesses them, and hold points.
- Approved manufacturers and the rule for equals.
- Warranties, spare parts, training and O&M manual requirements.
- Put them in the Specification Requirements Register with dates.
Common traps
- A requirement in Part 1 or in the general requirements that nobody priced (extra tests, extended warranty).
- An old standard edition referenced: ask which edition applies.
- Words like 'or equal' still need the engineer's approval.
Use with this guide
Specification Requirements Register
Every submittal, test, sample, mock-up, warranty and O&M requirement by specification section, with due and done dates and overdue flags
- How to use
- Register
- Register (SAMPLE)
Specification Compliance Statement
Clause by clause: specified requirement, offered, complies / deviation / not applicable, reference in the data sheet, with a summary of deviations for the submittal
- How to use
- Compliance
- Compliance (SAMPLE)
Submittal & RFI Tracker
Two registers with status codes, due dates, days open and overdue flags
- How to use
- Submittal register
- RFI register