Hot Work

Hot work is any task producing flames, sparks or heat that could ignite materials: welding, cutting, brazing and grinding.

Before you start

  • Get a hot work permit signed by the authorised person.
  • Remove combustibles from the area, or cover them with fire blankets. NFPA 51B uses a 35 ft (about 11 m) radius.
  • Check for flammable gases or vapours, especially near tanks, drains and fuel lines.
  • Place a suitable fire extinguisher at the work point.

During and after

  • A trained fire watch stays during the work and for a period after it stops, often at least 30 to 60 minutes.
  • Shield nearby workers from sparks and arc flash with screens.
  • Close the permit only after the final area check.
Good to knowMany hot work fires start after the welders have left. Never shorten the fire watch to finish early.