FIDIC Rainbow: Red, Yellow, Silver
FIDIC publishes standard construction contracts, each identified by its cover colour. The colour tells you who designs and how risk is shared.
The main books
| Book | Design by | Typical use |
|---|---|---|
| Red | Employer | Building and engineering works; contractor builds to the employer's design, paid on remeasured quantities |
| Yellow | Contractor | Plant and design-build; contractor designs to the employer's requirements, lump sum |
| Silver | Contractor | EPC / turnkey; contractor carries most risk for a fixed price and time |
| Green | Either | Short form for small or simple works |