ELV

Fiber Testing: OLTS, OTDR and More

Fiber testing proves that each link is installed correctly and that its loss is within the budget. TIA and ISO/IEC standards define two levels: Tier 1 (basic) and Tier 2 (extended).

The tests

  • Visual fault locator (VFL): red light to check continuity and find breaks or tight bends near the ends.
  • End-face inspection: a fiber microscope checks every connector against IEC 61300-3-35 before mating. Dirt is the first cause of failed links.
  • Tier 1 – OLTS (light source and power meter): measures insertion loss of the whole link at two wavelengths (850/1300 nm multimode, 1310/1550 nm single-mode). This is the pass/fail test.
  • Tier 2 – OTDR: sends pulses and plots a trace of every connector, splice and bend along the link with its distance and loss. Use it to prove workmanship and locate faults.
  • Polarity and length are recorded with the Tier 1 results.

Doing it right

  • Set the reference with the one-jumper method (TIA Method B) so the result includes both end connectors.
  • For multimode, use an Encircled Flux compliant launch condition (IEC 61280-4-1) for repeatable results.
  • With an OTDR, use launch and receive fibers so the first and last connectors are measured, and test from both ends to average splice loss.
  • Compare each result with the calculated loss budget, not with a generic number. Use the fiber loss budget calculator in this site.

TIA-568 maximum loss values

ComponentMax loss
Mated connector pair0.75 dB
Fusion or mechanical splice0.3 dB
Multimode fiber3.5 dB/km at 850 nm · 1.5 dB/km at 1300 nm
Single-mode, inside plant1.0 dB/km
Single-mode, outside plant0.5 dB/km
Good to knowInspect, clean, inspect again, then connect. Cleaning without inspecting often moves dirt to the core instead of removing it.

Use with this guide

Found an error? Tell us

Describe the problem briefly (the wrong value, the right one, and the reference if you have it). The page name is sent automatically.