Fiber Optics: Types Explained

Optical fiber carries light in a thin glass core. The two families are single-mode (small core, long distances) and multimode (larger core, short distances inside buildings and data centres).

Single-mode vs multimode

  • Single-mode (OS1a/OS2): 9 µm core, yellow jacket, 1310 and 1550 nm lasers. Distances of 10 km and more. Used for campus backbones, outside plant, FTTH and telecom.
  • Multimode (OM1–OM5): 50 or 62.5 µm core, 850 and 1300 nm sources. Used inside buildings and data centres up to a few hundred metres.
  • Single-mode cable is not more expensive than multimode, but its optics (transceivers) usually cost more.
  • Never mix single-mode and multimode in one link: the loss is very high.

Connectors and polish

  • LC: small, the most common today. SC: push-pull, common in FTTH and older panels. MPO/MTP: 8, 12 or 24 fibers in one connector for high-speed data centre links.
  • UPC polish has a blue body (single-mode); APC polish is angled 8° with a green body and lower reflection, used in FTTH and video.
  • Never connect APC to UPC: the air gap causes high loss and can damage the end faces.

Cable construction

  • Tight buffered cable for indoor use, easy to terminate.
  • Loose tube gel-filled or dry cable for outdoor and duct use; armoured where rodents or direct burial are expected.
  • Fiber colours follow TIA-598: blue, orange, green, brown, slate, white, red, black, yellow, violet, rose, aqua.

Fiber types at a glance

TypeCoreJacket10 Gb/s reach
OM162.5 µmOrangeAbout 33 m
OM250 µmOrangeAbout 82 m
OM350 µmAquaAbout 300 m
OM450 µmAqua / violetAbout 400 m
OM550 µmLime greenAbout 400 m, plus SWDM
OS29 µmYellow10 km and more
Good to knowFor a new building backbone, many designers now install single-mode only, or a hybrid cable with OS2 and OM4, so the cabling outlives several generations of equipment.