Concrete Grades: Cube vs Cylinder
European grading names concrete by two characteristic compressive strengths in MPa: cylinder first, then cube.
Reading the grade
- C30/37: 30 MPa on 150 × 300 mm cylinders, 37 MPa on 150 mm cubes.
- Cubes give higher results because the platen restraint is greater on a squat specimen.
- Gulf specifications and testing labs usually work in cube strength, so confirm which value a drawing means.
Hot weather concreting
- High temperature speeds setting, increases water demand and causes plastic shrinkage cracks.
- Typical controls: chilled water or ice, night pours, retarders, wind breaks and immediate curing.
- Many Gulf specifications cap concrete temperature at placing at around 32 °C. Check your project specification.
Common grades
| Grade | Typical use |
|---|---|
| C20/25 | Blinding (lower), non-structural slabs |
| C30/37 | General slabs, beams and columns |
| C40/50 | Foundations in aggressive soils, post-tensioned slabs |
| C50/60+ | High-rise columns, precast |