CMMS and CAFM Basics
A CMMS (computerised maintenance management system) or CAFM system holds the asset register, schedules PPM, tracks work orders and produces the KPIs. It is only as good as the data put into it.
Build a good asset register
- One record per maintainable asset, with a unique tag that matches the label on site.
- Location (building, floor, room), system, maker, model, serial number, install date and warranty end.
- Criticality rating and the PPM task list linked to each asset type.
- Take the data from the O&M manuals and as-built drawings at handover, and check it on site.
Work orders that produce useful data
- Record the failure cause and the action taken, not only 'done'.
- Record readings (current, pressure, temperature) so trends can be seen.
- Close the order with time spent and parts used, so costs and MTTR are real.
- Use mobile apps with photos and QR codes on assets to save time and reduce errors.
Use with this guide
Asset Register
Every maintainable asset with location, maker data, warranty, criticality and replacement year
- How to use
- Asset register
- Asset register (SAMPLE)
PPM Schedule & Compliance Tracker
PPM tasks by asset with next due date, overdue flags and monthly on-time compliance
- How to use
- PPM schedule
- PPM schedule (SAMPLE)
- Monthly compliance
- Monthly compliance (SAMPLE)