CCTV & Video Surveillance
Modern CCTV uses IP cameras powered by PoE, recording to an NVR or a video management system (VMS). Good design starts from what each camera must achieve: detect, observe, recognise or identify.
Design steps
- Define the purpose of each camera, then choose the lens and resolution to reach the required pixel density at the target distance.
- Check lighting: use IR or white light for night images, and wide dynamic range (WDR) for entrances facing bright sun.
- Use outdoor housings rated at least IP66, and IK10 where there is vandal risk.
- Follow the local authority requirements for camera locations, resolution and retention where they apply.
Recording and network
- H.265 compression roughly halves the storage of H.264 for similar quality.
- Storage = cameras × bitrate × recording time. Use the CCTV storage calculator in this site.
- Put cameras on a separate VLAN, change default passwords, update firmware and synchronise time with NTP.
- Choose ONVIF conformant cameras if the VMS and camera brands differ.
DORI pixel densities (EN 62676-4)
| Level | Pixels per metre | What you can do |
|---|---|---|
| Detect | 25 px/m | See that a person is present |
| Observe | 62 px/m | See what a person is doing |
| Recognise | 125 px/m | Recognise a known person |
| Identify | 250 px/m | Identify an unknown person beyond doubt |