Audio-Visual (AV) Systems
AV systems cover meeting rooms, auditoriums, digital signage and control rooms. The work is a mix of displays, audio, video signal transport and control, coordinated with architecture, acoustics and IT.
Main parts
- Displays: flat panels, LED walls or projectors. Size the image so the farthest viewer can read the content (AVIXA DISCAS gives the method).
- Audio: ceiling or beam-forming microphones, speakers and a DSP for echo cancellation in video calls.
- Signal transport: HDMI for short runs, HDBaseT up to 100 m over Cat6A, AV over IP (e.g. Dante for audio) for large systems.
- Control: a touch panel or room booking panel to switch sources, volume and lighting.
Coordination
- Agree blocking (wall reinforcement) for displays and the rack location with the architect.
- Provide power and data at the display, the table box and the ceiling devices.
- Room acoustics matter: hard glass rooms need absorption or the best microphones will still sound poor.
Typical signal reach
| Method | Typical distance |
|---|---|
| HDMI passive cable | Up to about 10 m |
| HDBaseT over Cat6A | Up to 100 m |
| AV over IP (network) | Any distance on the LAN |
| Fiber extenders | Several hundred metres to km |