Asset Life Expectancy and Replacement Planning
Every asset has an economic life. A lifecycle (replacement) plan spreads capital costs over the years and avoids surprises when old equipment fails.
Indicative economic life (use CIBSE Guide M and maker data for your plan)
- Chillers and air handling units: about 15–25 years.
- Split and packaged air-conditioning units: about 10–15 years.
- LV switchboards and distribution boards: about 20–30 years.
- Standby generators: about 20–30 years with good maintenance.
- UPS units: about 10–15 years; VRLA batteries: about 3–10 years depending on design life and temperature.
- Pumps: about 15–20 years; BMS controllers and software: about 10–15 years.
Building the plan
- Start from the asset register: install date, condition score and criticality.
- Adjust life for climate and use: heat, dust and 24/7 running shorten life in the Gulf.
- Watch for obsolescence: spare parts and software support often end before the hardware wears out.
- Review the plan every year with condition surveys and failure history.
Use with this guide
Asset Register
Every maintainable asset with location, maker data, warranty, criticality and replacement year
- How to use
- Asset register
- Asset register (SAMPLE)
Store Material Register
Item list with live stock balance and reorder flags, a stock movement log, and a sub-store receiving note for material from the main store
- How to use
- Item list
- Stock movements
- Receiving from main store
- Item list (SAMPLE)
- Stock movements (SAMPLE)
- Receiving from main (SAMPLE)