Access Control Systems
Access control decides who can open which door and when, and keeps a log of every event. A door typically has a reader, a lock, a door contact and a request-to-exit device wired to a controller on the network.
Door components
- Reader: card, PIN, mobile or biometric. Prefer secure credentials (e.g. MIFARE DESFire) over old 125 kHz proximity cards, which are easy to copy.
- Controller: holds the access rights so doors keep working if the network drops. OSDP is the secure modern reader protocol; Wiegand is older and unencrypted.
- Lock: electromagnetic lock (maglock), electric strike or motorised lock.
- Door contact for door-forced and door-held-open alarms, REX button or sensor, and a green emergency door release at escape doors.
Fail-safe or fail-secure
- Fail-safe: unlocks when power is lost. Required on escape routes so people can always get out.
- Fail-secure: stays locked when power is lost. Used for stores, server rooms and perimeter doors that are not escape routes.
- On a fire alarm, escape doors must release. This is wired from the fire alarm panel and must not depend on software alone.
Integration
- Link door alarms to CCTV so the operator sees the camera view with the event.
- Coordinate the door hardware schedule with the architect early: frame, lock and cable routes must be ready before doors are hung.
- Provide battery backed power supplies sized for the locks and controllers.
Common lock types
| Lock | Behaviour on power loss | Typical use |
|---|---|---|
| Maglock (EM lock) | Fail-safe | Glass doors, escape routes |
| Electric strike | Either (selectable) | Office doors, timber doors |
| Motorised lock | Either | High security and fire doors |
| Electric bolt | Usually fail-safe | Frameless glass doors |