Engineering library

Solar & Renewables

Key standards & codes

Editions checked: Nov 2026 · the contract and specification always decide which edition applies

  • IEC 62446-1:2016+A1:2018Grid-connected PV systems: documentation, testing and inspection
  • IEC 60364-7-712Requirements for solar photovoltaic power supply systems
  • IEC 61215 seriesDesign qualification of crystalline silicon PV modules
  • IEC 62109 seriesSafety of power converters for PV systems
  • IEC 61730-1:2023PV module safety qualification
  • IEC 62548-1:2023PV arrays: design requirements
  • IEC 61724-1PV system performance monitoring
  • IEC 62933 seriesElectrical energy storage (battery) systems
  • IEC 62619Safety of industrial lithium batteries

Recommended books

Free online resources

Software & tools

PVsystHelioScopeSAM (free, NREL)AutoCAD

Some book links are affiliate links. If you buy through them, the site may earn a small commission at no extra cost to you.

Standards are copyrighted. Buy them from the publisher or access them through your company's subscription. Always use the edition your project specifies.