Engineering library

Roads & pavements

Key standards & codes

Editions checked: Nov 2026 · the contract and specification always decide which edition applies

  • AASHTO Guide for Design of Pavement Structures (1993)Empirical flexible and rigid pavement design
  • AASHTO A Policy on Geometric Design of Highways and StreetsThe "Green Book": alignment, sight distance, cross-sections
  • QCS 2024Qatar Construction Specifications: roadworks section
  • Qatar Highway Design Manual (QHDM)Ashghal road design manual for Qatar
  • Qatar Traffic Manual (QTM)Signs, markings and traffic control in Qatar
  • ASTM D1557 / AASHTO T 180Modified Proctor compaction test
  • ASTM D1883California Bearing Ratio (CBR) of laboratory-compacted soils
  • ASTM D6927Marshall stability and flow of asphalt mixtures
  • AASHTO M 320Performance-graded (PG) asphalt binder
  • BS EN 13108-1Bituminous mixtures: asphalt concrete
  • AASHTO M 323 / R 35Superpave volumetric mix design
  • BS EN 12697 seriesBituminous mixtures: test methods
  • ASTM D6433Pavement condition index (PCI) surveys
  • AASHTO Roadside Design GuideClear zones, barriers and roadside safety
  • MUTCD (US)Manual on Uniform Traffic Control Devices (reference)

Recommended books

Free online resources

Software & tools

Autodesk Civil 3DOpenRoads DesignerAASHTOWare Pavement MEKENPAVEPTV Vissim

Some book links are affiliate links. If you buy through them, the site may earn a small commission at no extra cost to you.

Standards are copyrighted. Buy them from the publisher or access them through your company's subscription. Always use the edition your project specifies.