Engineering library

Process & industrial

Key standards & codes

Editions checked: Nov 2026 · the contract and specification always decide which edition applies

  • ASME B31.3Process piping
  • ASME B16.5 / B16.47Pipe flanges and flanged fittings
  • ASME B36.10M / B36.19MWelded and seamless steel pipe / stainless steel pipe
  • ASME BPVC Section VIIIPressure vessels
  • ASME PCC-1 / PCC-2Bolted flange joint assembly / repair and pressure testing
  • API 520 Parts I and IISizing, selection and installation of pressure-relieving devices
  • API 521Pressure-relieving and depressuring systems
  • API 526Flanged steel pressure-relief valves
  • IEC 60079 seriesExplosive atmospheres (classification, equipment, installation, inspection)
  • IEC 61511Functional safety: safety instrumented systems for the process industry
  • ISA 5.1Instrumentation symbols and identification
  • Client standardse.g. Saudi Aramco SAES and QatarEnergy specifications, which often add to the international codes
  • ASME B31.4 / B31.8Pipelines for liquids / gas transmission and distribution
  • API 650Welded tanks for oil storage
  • API 610Centrifugal pumps for petroleum and gas industries
  • ASME B16.34 / API 598Valves: design / inspection and testing
  • NFPA 30Flammable and combustible liquids code
  • ISO 15156 (NACE MR0175)Materials for use in H₂S-containing (sour) environments

Recommended books

Free online resources

Software & tools

AVEVA E3D / Hexagon Smart 3DAutoCAD Plant 3DCAESAR II (pipe stress)Aspen HYSYS (process simulation)SmartPlant Instrumentation (SPI)

Some book links are affiliate links. If you buy through them, the site may earn a small commission at no extra cost to you.

Standards are copyrighted. Buy them from the publisher or access them through your company's subscription. Always use the edition your project specifies.