Engineering library

Plumbing & Fire

Key standards & codes

Editions checked: Nov 2026 · the contract and specification always decide which edition applies

  • NFPA 13: 2025Installation of sprinkler systems
  • NFPA 14: 2024Standpipe and hose systems
  • NFPA 20: 2025Stationary fire pumps
  • NFPA 72: 2025Fire alarm and signaling code
  • International Plumbing CodeICC model plumbing code
  • BS EN 12056 seriesGravity drainage systems inside buildings
  • QCDD Fire Safety HandbookQatar Civil Defence fire safety requirements
  • SBC 801 (SBC 2024)Saudi Building Code: fire protection
  • SBC 701 (SBC 2024)Saudi Building Code: plumbing
  • BS EN 806 seriesWater supply installations inside buildings
  • Uniform Plumbing CodeIAPMO model plumbing code (used on some Gulf projects)

Recommended books

Free online resources

Software & tools

Revit MEPAutoSPRINKPipe Flow ExpertEPANET

Some book links are affiliate links. If you buy through them, the site may earn a small commission at no extra cost to you.

Standards are copyrighted. Buy them from the publisher or access them through your company's subscription. Always use the edition your project specifies.