Engineering library

Plant & temporary works

Key standards & codes

Editions checked: Nov 2026 · the contract and specification always decide which edition applies

  • BS 7121 seriesCode of practice for safe use of cranes
  • ASME B30.5Mobile and locomotive cranes
  • ASME B30.9 / B30.26Slings / rigging hardware
  • EN 13000Cranes: mobile cranes
  • LOLER 1998UK Lifting Operations and Lifting Equipment Regulations (widely used as a reference)
  • BS EN 12811-1Temporary works equipment: scaffolds
  • NASC TG20Good practice guidance for tube and fitting scaffolding
  • BS 5975Code of practice for temporary works procedures and falsework
  • BS EN 12812Falsework: performance requirements and general design
  • CIRIA Report 108Concrete pressure on formwork
  • IEC 60364-7-704Electrical installations on construction and demolition sites
  • BS 7375Distribution of electricity on construction and demolition sites
  • ASME B30.2Overhead and gantry cranes
  • ISO 4309Cranes: wire ropes, care, inspection and discard
  • BS EN 13414 / BS EN 1492Steel wire rope slings / textile slings
  • OSHA 1926 Subpart CCCranes and derricks in construction (US)
  • BS 8460Safe use of mobile elevating work platforms (MEWPs)

Recommended books

Free online resources

Software & tools

Crane makers' lift-planning and outrigger-load apps3D lift-planning toolsAutoCAD / Revit for lift and temporary works layoutsFormwork suppliers' design software

Some book links are affiliate links. If you buy through them, the site may earn a small commission at no extra cost to you.

Standards are copyrighted. Buy them from the publisher or access them through your company's subscription. Always use the edition your project specifies.