Engineering library

HSE & Quality

Key standards & codes

Editions checked: Nov 2026 · the contract and specification always decide which edition applies

  • ISO 45001Occupational health and safety management
  • ISO 9001Quality management systems (a revised 2026 edition is replacing the 2015 edition; check which one your certificate uses)
  • ISO 14001:2026Environmental management systems
  • OSHA 29 CFR 1926US safety and health regulations for construction
  • OSHA 29 CFR 1910US safety and health regulations for general industry
  • NFPA 70EElectrical safety in the workplace
  • ANSI/ASSP Z359Fall protection code
  • HSG65 (UK HSE)Managing for health and safety
  • ISO 45003Psychological health and safety at work
  • Qatar Ministerial Decision 17/2021Heat stress: work bans and the WBGT limit

Recommended books

Free online resources

Software & tools

Excel / Power BI dashboardsAconex (NCR & inspection workflows)

Some book links are affiliate links. If you buy through them, the site may earn a small commission at no extra cost to you.

Standards are copyrighted. Buy them from the publisher or access them through your company's subscription. Always use the edition your project specifies.