Engineering library

Fire protection

Key standards & codes

Editions checked: Nov 2026 · the contract and specification always decide which edition applies

  • NFPA 13: 2025Installation of sprinkler systems
  • NFPA 14: 2024Standpipe and hose systems
  • NFPA 20: 2025Stationary pumps for fire protection
  • NFPA 25: 2026Inspection, testing and maintenance of water-based systems
  • NFPA 2001: 2025 / ISO 14520Clean agent fire extinguishing systems
  • NFPA 92: 2024Smoke control systems
  • NFPA 101: 2024Life Safety Code
  • SBC 801 (SBC 2024)Fire protection code (Saudi Arabia)
  • UAE Fire and Life Safety CodeCivil defence code (UAE)
  • Local civil defence requirementsQatar, Egypt and other authorities: always the governing document
  • NFPA 10Portable fire extinguishers
  • NFPA 11Low-, medium- and high-expansion foam
  • NFPA 15Water spray fixed systems
  • NFPA 80Fire doors and other opening protectives
  • NFPA 110Emergency and standby power systems
  • BS EN 12845Fixed firefighting systems: automatic sprinkler systems
  • BS 9999Fire safety in the design, management and use of buildings

Recommended books

Free online resources

Software & tools

AutoSPRINK / HydraCAD (sprinkler design and hydraulics)Elite Fire (hydraulics)FDS + Pyrosim (fire and smoke modelling)Pathfinder (evacuation)

Some book links are affiliate links. If you buy through them, the site may earn a small commission at no extra cost to you.

Standards are copyrighted. Buy them from the publisher or access them through your company's subscription. Always use the edition your project specifies.