Engineering library

Environmental

Key standards & codes

Editions checked: Nov 2026 · the contract and specification always decide which edition applies

  • ISO 14001:2026Environmental management systems
  • ISO 9613-2:2024Attenuation of sound during propagation outdoors
  • BS 5228-1 and -2Noise and vibration control on construction and open sites
  • GHG ProtocolCorporate greenhouse gas accounting (scopes 1, 2, 3)
  • Saudi Environmental Law (2020)Framework for environmental permits (NCEC)
  • Egypt Law 4/1994 on the EnvironmentEIA and environmental register (EEAA)
  • Qatar environmental regulationsEnvironmental studies and permits (Ministry of Environment and Climate Change)
  • BS 4142Rating and assessing industrial and commercial sound
  • IAQM construction dust guidanceAssessment of dust from demolition and construction (UK)
  • ISO 14064-1Greenhouse gas quantification and reporting for organizations
  • IFC Performance Standards / World Bank EHS GuidelinesEnvironmental and social requirements on lender-financed projects

Recommended books

Free online resources

Software & tools

Sound level meter software (manufacturer)Spreadsheet trackers for waste and permitsQGIS for site environmental mapping

Some book links are affiliate links. If you buy through them, the site may earn a small commission at no extra cost to you.

Standards are copyrighted. Buy them from the publisher or access them through your company's subscription. Always use the edition your project specifies.