HA Engineering Hub · Learn • Calculate • Check
Scientists study the world as it is. Engineers create the world that has never been.
— Theodore von Kármán, aerospace engineer
Free engineering calculators, guides, checklists and Excel tools, built on international standards, with local guidance for Qatar, Saudi Arabia and Egypt.
Free · no sign-up for calculators · standards cited · results are preliminary, verify before design
What are you trying to do?
Featured calculators
All calculators →Calculations
Ready calculators for every discipline
Engineering Topics
Standards, safety cards and lessons from failures
What's new
More resources
Electrical Center
Calculators, guides, checklists and exams for electrical and ELV engineers
Engineering Library
Codes, books, free resources and software
Careers & Certificates
Career paths, certificates and interview prep
Templates
Submittals, RFIs, method statements and reports
Glossary EN ↔ AR
Engineering terms in English and Arabic
Exam Corner
Practice quizzes for PMP, NEBOSH, LEED and more
Jobs Board
Engineering vacancies shared by members
Engineers Chat
Ask and share know-how by discipline
Engineering calculators
Electrical, mechanical, civil, plumbing, renewables and project controls. Every calculator opens with typical values filled in.
Electrical Center: calculators in design orderAbout these calculators
Each calculator shows the formula, the standards it follows (IEC, BS 7671, NFPA, ASHRAE, ACI and others), the assumptions behind the result, and a worked example with the default values. Results update as you type, and you can print a one-page calculation sheet for your file.
They are made for quick checks on site and early design in Qatar, Saudi Arabia, Egypt and the wider Gulf. Results are preliminary: confirm them with the project specification, the local authority rules and the manufacturer's data before final design.
Things you should know
Short, practical notes on standards, site safety, contracts and lessons from famous failures.
Build your engineering career
Pick a career path to see how it progresses, the skills and certificates it needs, and typical interview questions.
A shelf for every engineer
Key standards, recommended books, free online resources and the software each discipline uses.
Electrical
Key standards & codes
Editions checked: Nov 2026 · the contract and specification always decide which edition applies
- IEC 60364 seriesLow-voltage electrical installations
- BS 7671:2018+A4:2026IET Wiring Regulations (UK, widely used in the Gulf), with Amendment 4
- IEC 61439 seriesLow-voltage switchgear and controlgear assemblies
- IEC 60909-0Short-circuit currents in three-phase AC systems
- IEC 62305 series (Part 1:2024, Ed. 3)Protection against lightning
- NFPA 70: 2026National Electrical Code (US)
- KAHRAMAA RegulationsWiring and installation rules for Qatar
- QCS 2024 · Section 21Qatar Construction Specifications: electrical works
- SBC 401 (SBC 2024)Saudi Building Code: electrical requirements
- Egyptian Electrical CodeEgyptian code for electrical installations in buildings
- IEC 60364-4-41Protection against electric shock
- IEC 60364-5-52Selection of wiring systems and current-carrying capacity of cables
- IEC 60287 seriesCurrent rating of electric cables
- IEC 60502 seriesPower cables with extruded insulation (1–30 kV)
- IEC 61936-1Power installations exceeding 1 kV AC
- IEC 62271-200Metal-enclosed MV switchgear (1–52 kV)
- IEC 60076 seriesPower transformers
- IEC 60947-2 / IEC 60898-1Circuit-breakers: industrial / household and similar
- IEC 60529Degrees of protection by enclosures (IP code)
- IEEE 1584-2018Arc-flash hazard calculations
- IEC 62040-3UPS: performance and test requirements
- ISO 8528 seriesGenerating sets driven by reciprocating engines
- EN 12464-1Lighting of indoor work places
- BS 5266-1Emergency lighting: code of practice
Recommended books
- Electrical Installation GuideSchneider Electric (free)
- On-Site Guide (BS 7671)
The IETView - Power System Analysis and Design
Glover, Overbye & SarmaView - Electric Power Distribution System Engineering
Turan GönenView
Free online resources
Software & tools
Some book links are affiliate links. If you buy through them, the site may earn a small commission at no extra cost to you.
Standards are copyrighted. Buy them from the publisher or access them through your company's subscription. Always use the edition your project specifies.
Practice before the real exam
Short practice quizzes with instant scoring and explanations.
Ready formats for daily site work
Open a template, copy it, and paste it into Word, Excel or an email.
Excel sheets for site and design work
Each workbook has a blank sheet, a completed SAMPLE and a How-to-use tab. Fields marked project-defined follow your contract.
Document outlines
Engineering terms in English and Arabic
Search in either language. Useful for bilingual site teams and reports.
Engineering vacancies
Vacancies shared by members and recent postings from external job sites. Links open the original posting. Always verify the employer, and never pay to apply.
Site checklists
Tick items as you go. Your progress is saved in this browser.
Electrical Center
Everything on the site for electrical and ELV engineers in one place: calculators in the order you design, site guides, checklists, practice exams, careers and the standards to keep at hand.
Quick reference
The tables engineers look up every day, in one place.
Common drawing symbols
Typical symbols with their names in English and Arabic. Always check the legend on your project drawings.
Engineering news and events
Recent project and industry headlines, and the major exhibitions coming up. Updated weekly.
Latest news
Upcoming events
Dates come from organiser and listing sites. Confirm on the official website before booking travel.
Ask a technical question
Get an instant answer on electrical, mechanical, civil, plumbing, contracts, safety or careers. Ask in English or Arabic.
Answers are generated by AI and are not reviewed by an engineer. Each answer lists its sources and what to verify. Use it to learn and to prepare questions, not as a design approval.
Ask, answer, share
Pick a channel for your discipline. Be specific: state the standard, voltage, load or location you are working with.
Answers here come from members and are not reviewed. Check them against the standard, the project specification and a qualified engineer before using them.