Exam corner

Process & industrial basics

10 random questions from a bank of 155 questions you have not seen yet

1ASME B31.3 covers…

2The usual B31.3 hydrostatic test pressure is…

3For a single relief valve (non-fire case), the allowable accumulation is normally…

4An ASME B16.5 Class 150 flange (Group 1.1) is rated at ambient to about…

5The set pressure of the first relief valve is normally…

6Pneumatic tests need extra care because…

7Ex d protection works by…

8In the B31.3 wall-thickness check, the corrosion allowance is…

9Temperature class T3 means the maximum surface temperature is…

10Gas group IIC equipment can also be used in…