1A crane lift's total hook load includes…

2Crane capacity on the load chart generally…

3Outrigger ground pressure is reduced by…

4A 2-leg sling at 30° from horizontal carries, in each leg…

5Socket outlets on construction sites are normally protected by…

6Striking formwork should be based on…

7For a 4-leg sling without equalising rigging, common practice assumes…

8Toe boards on a scaffold platform prevent…

9Under BS 5975, the person who coordinates temporary works is the…

10A choke hitch generally…