Site & delivery

Temporary Works & Lifting Engineer

Plans and checks the temporary structures and lifting operations that make construction possible: crane selection and lift plans, scaffolds, formwork, falsework, excavation support and site power.

Career path

  1. 1
    Site / graduate engineerLift plans for routine lifts, inspections, permits
  2. 2
    Temporary works engineerFalsework and scaffold designs or checks, critical lift plans
  3. 3
    Temporary works coordinatorRuns the temporary works procedure and register on a project
  4. 4
    Temporary works manager / designerCompany procedures, complex designs, independent checks

Core skills

Load charts and crane selectionRigging and lift planningBS 5975 temporary works procedureScaffold and falsework principlesGround bearing and outrigger padsSite safety leadershipAutoCAD lift studies

Recommended certificates

CertificateIssued byWhen
Local engineer registration (Qatar, Saudi Arabia, Egypt)National authorityEarly career
Appointed person / lift supervisor trainingRecognised training providerEarly career
Temporary works coordinator coursee.g. CITB or equivalentMid-career
NEBOSH International General CertificateNEBOSHMid-career
Chartered Engineer (CEng)ICE / IStructESenior
Career tipLearn to say no politely. The temporary works engineer is often the one person on site who must stop a lift or a pour when the paperwork or the ground isn't ready.

Interview questions

When is a lift critical?

When it is above the project's utilisation threshold (often 75–90 % of chart capacity), uses two cranes, lifts people, passes over live plant or occupied areas, or has an unusual load. Critical lifts need a detailed plan approved under the lifting procedure.

How do you check a crane's outrigger on site?

Get the outrigger load from the maker's calculator for the actual lift, compare the pressure under the mat with the allowable bearing from a geotechnical assessment, and check for services, voids, slopes and excavation edges nearby.

What does a permit to load confirm?

That the falsework was built to the design, inspected by the temporary works supervisor and accepted by the coordinator, so concrete can be placed.

Check each certifying body's website for current eligibility and exam requirements.