Temporary Works & Lifting Engineer
Plans and checks the temporary structures and lifting operations that make construction possible: crane selection and lift plans, scaffolds, formwork, falsework, excavation support and site power.
Career path
- 1Site / graduate engineerLift plans for routine lifts, inspections, permits
- 2Temporary works engineerFalsework and scaffold designs or checks, critical lift plans
- 3Temporary works coordinatorRuns the temporary works procedure and register on a project
- 4Temporary works manager / designerCompany procedures, complex designs, independent checks
Core skills
Recommended certificates
| Certificate | Issued by | When |
|---|---|---|
| Local engineer registration (Qatar, Saudi Arabia, Egypt) | National authority | Early career |
| Appointed person / lift supervisor training | Recognised training provider | Early career |
| Temporary works coordinator course | e.g. CITB or equivalent | Mid-career |
| NEBOSH International General Certificate | NEBOSH | Mid-career |
| Chartered Engineer (CEng) | ICE / IStructE | Senior |
Interview questions
When is a lift critical?
When it is above the project's utilisation threshold (often 75–90 % of chart capacity), uses two cranes, lifts people, passes over live plant or occupied areas, or has an unusual load. Critical lifts need a detailed plan approved under the lifting procedure.
How do you check a crane's outrigger on site?
Get the outrigger load from the maker's calculator for the actual lift, compare the pressure under the mat with the allowable bearing from a geotechnical assessment, and check for services, voids, slopes and excavation edges nearby.
What does a permit to load confirm?
That the falsework was built to the design, inspected by the temporary works supervisor and accepted by the coordinator, so concrete can be placed.
Check each certifying body's website for current eligibility and exam requirements.